Customer : BOSCH / SIEMENS BSH Ev Aletleri Sanayi ve Ticaret A.S.
Project Area : Cerkezkoy borough of Tekirdag province
Project Time Period : March to June 2015
  • OVERVIEW
  • TECHNIC

This project was a tunnel and road between FRF1 Refrigerant Factory and Plastics Factory located within B/S/H Campus situated in Cerkezkoy Technology Park. The aboveground part of the tunnel was covered with roof panels. Its elevation was built of polycarbon material to make use of sunlight. 

 

We were hired for the project design stage, provided static, architectural, electrical and mechanical solutions, drew the license and working drawings, managed the official approval stage, provided the survey, bills of estimate and technical specifications, and presented a preliminary budget. 